BIM Options

(New: 03/16/2024)

This tab is used to define the degree of detail and accuracy.

A screenshot of a computer screen

Description automatically generated

Model End Use

BIM collaboration workflow will require a quote. Pricing is dependent on project scope and quantity of model submittals required.

Is there a BIM Execution Plan?

BIM Execution plan (BXP/BEP), BIM Standards or Project execution plan. If the project has any BIM specifications or specific requirements, select Yes and please send documentation in along with the quote request. If no project specific requirements exist, BBNA can provide standard deliverables at key milestones (defined below).

Level of Development (LOD)
Can select more than one option.

Pre-Construction Model - LOD 300. Up to LOD 300 for all components, excluding panel and trim, at key milestones. For example; after Approval/Permit Design and after Final Design.

Final Model - LOD up to 350. Up to LOD 350 for primary structural components including bracing components, and up to LOD 300 for secondary framing components. Excludes panel and trim. Provided after Detailing has been completed.

Other – Contact your Service Center. Select this option if you have higher LOD requirements.  Please send that information in along with the quote request.

Link to BIM Forum: BIMforum LOD

Standard Controls: