Bracing - Flush Portal
Frame
(Revised: 04/01/08)
Flush Portal Frames.
·
Portal
Frame Column Offset of 1/2".
·
The
centerline of the portal from building line needs to be at 7 5/8” for inset,
1’-0 ½” for 6.5”, and 1’-2 ½” for 8.5” girts.
·
Portal
Frame Rafter Offset of (Rise Purlin Depth + Approx FS + 5").
Sample: Rise of 8 1/2" + 3/4" + 5" = 1'-2 7/16" Round up =
1'-3"
·
Detailing
- The Main Frame S3 Stiffener needs to be shortened. Refer to Design Manual
2.13 & 2.13ex.